Ep. 6 | This Obsolete ControlLogix Runs a Whole Line, and Nobody Will Modernize It [PLC Q&A]
Failed to add items
Add to basket failed.
Add to wishlist failed.
Remove from wishlist failed.
Adding to library failed
Follow podcast failed
Unfollow podcast failed
-
Narrated by:
-
By:
This obsolete ControlLogix has been running a whole production line for over a decade, the power supply just failed, and nobody will approve the modernization. In this Q&A I work through five real questions from the community, and the one that hits hardest is the nightmare cabinet: a dusty, ten foot high enclosure built around a controller that ended support years ago.
If you program, wire, commission, or maintain industrial systems, this episode is built for you. I go past the surface and into why this specific failure mode is so expensive. The controller in that chassis predates Studio 5000, which means you cannot flash it forward and the program carries no stored comments, so the next person to walk up uploads logic with zero documentation. Support ended around 2017, so if the processor cooks itself in that heat you cannot simply buy a replacement, and the same controller that runs a multimillion dollar line is worth maybe fifty dollars on the used market. Add an unsupported Data Highway Plus network that tops out at 57.6 kbps next to gigabit EtherNet/IP, and the real risk is not the one hour power supply swap. It is the four week outage when a peripheral fails and there is no spare and no migration plan. Unplanned downtime now averages around $260,000 per hour across manufacturing and closer to $400,000 per hour for US plants, which is exactly why the do nothing answer is the most expensive one.
From there I review a first automation project, a farm control panel built on an AutomationDirect CLICK PLC, and get specific on HMI design. Too much bright green and red, motor status that should show more than running or stopped, and a navigation scheme that changes position from screen to screen. I also critique a Siemens S7-313C and KTP 700 training kit, explain why I would add real networking gear and industrial buttons, and why an elevator is a better portfolio project than an obscure oil and gas spec. Then I share the most exciting project I have worked on, a full peanut butter plant modernization with Stratix switches, batch handling, and FactoryTalk View, and I close with a beginner deep dive on program structure, alarm management, and why HMI design is more important than most builders treat it.
If this kind of field level breakdown is useful, subscribe so you catch every Q&A.
Learn more at Joltek:
- Rockwell PLC Lifecycle Migration Guide: https://www.joltek.com/blog/rockwell-plc-lifecycle-migration-guide
- Control System Modernization Strategy: https://www.joltek.com/blog/control-system-modernization-strategy
- Root Causes of Downtime in Industrial Automation: https://www.joltek.com/blog/root-causes-downtime-industrial-automation
- Systems Modernization and Risk Management: https://www.joltek.com/services/service-details-systems-modernization-risk-management
Timestamps
0:00 Intro and how this Q&A works
0:50 HMI and UX review of a first automation project
9:50 The nightmare cabinet: an obsolete ControlLogix nobody will modernize
17:40 PLC training kit feedback: Siemens S7-313C and KTP 700
26:30 My most exciting PLC project: a peanut butter plant
32:30 Program structure, alarm management, and HMI design