Energy Decision # 61 - BTM Solar + Storage Explained: Resize, Add Storage, or Wait kapak görseli

Energy Decision # 61 - BTM Solar + Storage Explained: Resize, Add Storage, or Wait

Energy Decision # 61 - BTM Solar + Storage Explained: Resize, Add Storage, or Wait

Şimdi ücretsiz dinle, üyelik gerekmez

Program ayrıntılarını görüntüle

This Season's Biggest Deal | £0.99/mo for 3 months + £10 Audible bonus

£5.99/mo after 3 months - terms apply. Cancel monthly
Özet

Behind-the-meter solar + storage under successor net metering / net billing tariffs is now a tariff decision more than an equipment decision, because many states credit exported solar well below the retail rate you pay for power.


This is Energy Decision #61 in the complete C&I energy management series by Daniel Burke. It's part of his mission to create the world's largest, free, high-trust energy resource library for commercial and industrial consumers.


In this episode, Daniel Burke covers:

- Export credit vs. retail rate, and how net billing and avoided-cost export rates cut into commercial solar payback

- Time-of-use netting, minimum bills, fixed solar fees and annual true-up rules

- NEM measurement period, from monthly netting to instantaneous netting, and what it means for battery storage

- How to size commercial solar for self-consumption

- When solar plus storage pays under a successor tariff

- Net metering vs. gross metering vs. parallel metering, and why the meter is a contract

- The demand charge gap, covering ratchet clauses, non-coincident peak demand and standby charges

- Grandfathering provisions measured against project payback

- Vendor proposal red flags and the questions that surface them


Who this is for: facilities managers, operations directors, plant managers and CFOs at warehouse and distribution centers, retail chains, food and beverage manufacturers, commercial real estate portfolios and municipal facilities who are weighing a solar project under an export credit that no longer matches the retail rate.


If you're asking whether to resize your solar array for self-consumption, add battery storage, or wait until net metering rules settle, this episode is built for you.


Read the full breakdown on behind-the-meter solar + storage under successor net metering / net billing tariffs at tac-nrg.com


If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at tac-nrg.com/blueprint.


Visit tac-nrg.com to access the entire Energy Answers resource library and the Energy Decision Blueprint for qualified Indiana C&I operators.


00:00 Successor Tariffs and Export Credits

02:49 Sizing Solar for Self-Consumption

06:07 Role of Battery Storage

08:59 Metering Configurations

11:50 Demand and Standby Charges

15:05 Grandfathering Provisions

17:51 Navigating Utility Tariffs

20:50 Final Recommendations